Home › Home & Construction › Concrete Bag Calculator
Concrete Bag Calculator
Pre-mix bags are the easiest way to pour a small slab — until you're three bags short with the mixer still turning. This free concrete bag calculator works out your pour's volume and divides it by the standard yield of each bag size, so you know exactly how many 40, 50, 60 or 80 lb bags to load, with a waste allowance and cost if you want them.
The currency only changes the symbol and formatting — it never converts amounts. Leave the price blank to skip the cost.
| Concrete volume | 33.3333 cu ft · 1.2346 cu yd |
| Bags needed — exact | 74.07 bags |
| 40 lb bags (0.30 cu ft each) | 111.11 exact → 112 to buy |
| 50 lb bags (0.375 cu ft each) | 88.89 exact → 89 to buy |
| 60 lb bags (0.45 cu ft each) | 74.07 exact → 75 to buy |
| 80 lb bags (0.60 cu ft each) | 55.56 exact → 56 to buy |
| Estimated cost | $393.75 |
How it works
Every bag of pre-mix concrete makes a fixed, predictable amount of finished concrete — its yield, printed by the manufacturer and remarkably consistent across brands. So the calculation is just two steps: the volume of your pour, then that volume divided by the yield of the bag size you plan to use.
The yields are the standard published figures used by Quikrete and Sakrete for their regular mixes: a 60 lb bag makes 0.45 cu ft of placed concrete. These already account for the mixing water — the bag swells a little when wetted — so don't add anything for water. The waste allowance is applied to the exact count before rounding up to whole bags, giving you the margin for uneven digging, spillage and the last barrow that never quite empties.
The results table always shows all four bag sizes, not just the one you selected. That's deliberate: the right size is often a handling decision, not a math one — an 80 lb bag is the cheapest per cubic foot but a serious lift, repeated sixty times. Plenty of people buy the smaller size for exactly that reason, and the table makes the trade-off a one-glance comparison.
Worked example
The same 10 ft × 10 ft patio slab, 4 inches thick, using 60 lb bags at $5.25 with no waste allowance.
Step 1 — volume: 10 × 10 × (4 ÷ 12) = 33.33 cu ft (1.235 cu yd).
Step 2 — divide by the 60 lb yield: 33.33 ÷ 0.45 = 74.07 bags exactly.
Step 3 — round up: you can't buy 0.07 of a bag, so 75 bags to buy.
Step 4 — cost: 75 × $5.25 = $393.75.
Compare the sizes in the table for the same slab: 112 bags at 40 lb, 89 at 50 lb, 75 at 60 lb or 56 at 80 lb. And the sanity check from the FAQ still holds — one full cubic yard of this slab would take exactly 27 ÷ 0.45 = 60 of the 60 lb bags.
Before you start mixing
Stage the bags before the first one is opened. Concrete work runs against the clock once water goes in. Have all the bags beside the mixer, the water supply ready, and the path to the pour clear — the count above is only useful if the work flows.
Keep bags dry until their moment. Pre-mix absorbs humidity through the paper and starts to set in the bag. Store them off the ground, under cover, and don't buy months ahead for a big job — fresh bags mix noticeably easier.
Mix to the bag's stated water, not by feel. Too much water is the most common home-pour mistake: it makes mixing easier and the finished slab permanently weaker and dustier. Measure the water for the first bag and keep it consistent.
FAQ
How many 60 lb bags of concrete are in a cubic yard?
Sixty. A 60 lb bag of pre-mix yields about 0.45 cubic feet of finished concrete, and a cubic yard is 27 cubic feet: 27 ÷ 0.45 = 60 bags exactly. The same arithmetic gives the other sizes — 90 bags at 40 lb (27 ÷ 0.30), 72 at 50 lb (27 ÷ 0.375) and 45 at 80 lb (27 ÷ 0.60). It's a useful sanity check on any bag count.
What does “yield” mean on a bag of concrete mix?
Yield is the volume of finished, placed concrete one bag makes once the water is added and it sets — not the volume of the dry bag itself. The standard figures (used by Quikrete and Sakrete) are about 0.30 cu ft for a 40 lb bag, 0.375 for 50 lb, 0.45 for 60 lb and 0.60 for 80 lb. Because yield already accounts for the water, you simply divide your project's volume by the yield.
How much waste allowance should I add?
Five percent covers most tidy jobs on well-prepared ground; ten percent is safer for uneven excavation, spilled barrows, or a first pour. Running out mid-slab is much worse than a spare bag — a cold joint where fresh concrete meets half-set concrete is a permanent weak line — and unopened bags can usually be returned or stored dry for the next job. The allowance options above add it before rounding up.
When are bags better than a ready-mix truck?
Bags win on small, awkward jobs: a few post holes, a small pad, repairs — anywhere a truck can't reach or the volume is well under a cubic yard. The math flips as volume grows: at a cubic yard you're mixing around sixty 60 lb bags by hand or mixer, which is hours of heavy work, and ready-mix delivered is usually cheaper per yard besides. Between one and two yards, it depends on access and your back.
Does this calculator work for post holes?
It works for rectangular pours — slabs, pads and footings with a length, width and depth. A round post hole is a cylinder, so its volume is different; the fence post calculator on this site handles post holes and counts bags for them directly. For a rough conversion, treat the hole as a square of the same width — you'll overestimate slightly, which for post holes is the safe direction.